Assessment Dashboard
Measure the site. Model the future. Price the constraint.
MO GREEN combines site electrical infrastructure, measured demand, proposed electrification loads, operational constraints and DSO curtailment information into a transparent decision: Accept, Negotiate or Reinforce.
Workflow readiness
Client win-win snapshot
Existing vs projected demand
Site, client & authority evidence
Identify the site, DNO, assessment purpose and the commercial evidence that will support any cost/time-saving claim.
Client & site
Bill / authority evidence
Existing electrical infrastructure
Determine the governing capacity from the supply, main breaker, cable and transformer. Cable ampacity is engineer-entered/approved; the MVP does not reproduce proprietary BS tables.
30-minute CT / meter demand curve
Enter or upload half-hourly readings. MO GREEN builds the demand curve immediately, records the measurement date and uses UK weather only as contextual evidence; the engineering adjustment factor remains explicit and reviewer-controlled.
timestamp,demand_kw, time,demand_kw, or timestamp,current_a. For current readings the system uses the Step 2 voltage, phase and power factor.Measured / adjusted baseline
Half-hourly readings
| Timestamp / time | Input | Calculated kW |
|---|
Proposed electrification loads
Build the future load scenario with explicit coincidence factors and operating windows. The factor is an engineering input until MO GREEN's proprietary dataset has sufficient validated evidence.
| Load type | Qty | Rating kW | Coincidence | Start | End | Mode | Diversified kW |
|---|
Adjusted baseline + proposed loads
Flexible connection & curtailment exposure
Overlay a DSO available-capacity profile against projected demand and critical operating windows. The MVP uses manual CSV upload so every assumption remains visible and auditable.
timestamp,available_capacity_kw or time,available_capacity_kw. Missing regulatory/compensation inputs are not assumed.Projected demand vs available capacity
Client saving & programme benefit
Quantify the avoided or deferred reinforcement cost and programme delay only from documented client/DNO evidence. The output automatically distinguishes confirmed, indicative and potential benefit.
Branding & engineering configuration
Keep commercial presentation and engineering logic transparent. Decision bands are editable only as controlled configuration and should be approved before production use.
Branding
Decision configuration
Professional disclaimer
Audit trail
Final Report & CEng Sign-off
Review the final recommendation, complete the Chartered Engineer approval, and issue the branded final report. The CEng sign-off is the final section of the issued report.